The North
Runs On
Innlink.
Ready-mix concrete, crushed aggregates, civil construction, heavy haul and winter road construction for Moosonee, Moose Factory and the James Bay coast.
Local plant, materials and crews.
Innlink has operated in Moosonee since 1998. The company manages a licensed limestone quarry, ownes four licenced gravel pits, two concrete batch plants, two crushing spreads a computerized scale house and a 34-truck haul fleet, and employs more than 60 people, most of them from Moosonee and Moose Factory and surrounding area.
Member of Moose Cree
Member of Moose Cree. CCIB (formerly CCAB) Certified Aboriginal Business. Holder of the Wetum Road 2025/26 contract.
Quarry, batch plants and fleet
Crushed limestone from the Moosonee quarry on Quarry Road. Ready-mix concrete from Concrete Ontario certified batch plants in Moosonee and Moose Factory.
Load-level documentation
Every load is weighed, numbered, timestamped, GPS-tracked and photographed at the scale. 11,655 tickets and 227,219 tonnes in the twelve months to date. Per-load reports are available to owners and engineers.

Wetum Road construction and maintenance.
The Wetum Road connects Moose Factory and Moosonee to the provincial highway network each winter. Innlink constructs the winter road, maintains and grades it through the winter season, coordinates closures with Moose Cree First Nation and decommissions it in spring.
The 2025/26 contract was awarded to Innlink in November 2025.
→ Wetum Road project detailsConcrete, aggregates and civil works.

Ready-Mix and Flatwork
Batch plants in Moosonee and Moose Factory. Slabs, sidewalks, pads and foundations.

Quarry and Supply
1" minus, 4" minus, Granular A and B, rip rap.

Watermain and Sanitary
Road rehabilitation, services, culverts and drainage.

Wetum Road
Construction, maintenance and decommissioning each season.

Site Development
Clearing, grubbing, excavation, backfill and grading.

Heavy Haul
34 trucks. Aggregate delivery and equipment moves.

Dredging
Moose River dredging and spoil management.
Sep 2025 to Sep 2026
Owners and contractors Innlink works with.
Recent work.
Wabun Road and Fifth Street
Sanitary sewer and watermain rehabilitation. Excavation, backfill, ditching and drainage. Engineer: EXP.
Moosonee Hospital Early Works
Clearing, grubbing, bulk excavation, backfill and drainage improvements for the new hospital site.
Wetum Road
Construction, maintenance and decommissioning of the winter road.
Scale house and ordering, online.
The system that runs the Innlink scale house and yards is available to customers and suppliers.
Contractor Portal
Scale tickets, delivery tracking, invoices and payment for every project.
Purchasing and Sales
Purchase orders, sales orders, delivery scheduling and invoice reconciliation.
Aggregate Calculator
Convert an area and depth to cubic metres, tonnes and truckloads.
Request a quote.
Send drawings, quantities or a scope description to simonleonard@innlink.ca, or call 705-272-2556.
Contact Innlink