Project record.

Selected projects with photographs from Innlink sites. Contract values are available to owners and engineers on request.

Civil and municipal

Watermain, sanitary and roads.

Wabun Road and Fifth Street Sanitary and Watermain Rehabilitation

2025 to 2026
OwnerTown of Moosonee
EngineerEXP
RolePrime contractor
LocationMoosonee, ON

Rehabilitation of the sanitary sewer and watermain on Wabun Road and Fifth Street. Excavation, backfill, ditching and drainage; catch basins and manholes salvaged and reinstated. 42-line certified bill of quantities. In progress, 2026.

Bay Road and Second Street Sewer, Water and Road Rehabilitation

2022 to 2025
OwnerTown of Moosonee
EngineerEXP
RolePrime contractor
LocationMoosonee, ON

Sanitary, watermain and full road rehabilitation: road building, ditching, granular base and surface. Local sub-trade: Katapatuk Contracting. Completed 2025.

Ferguson Road Watermain and Road Building

2019
OwnerTown of Moosonee
RolePrime contractor
LocationMoosonee, ON

Watermain installation and road construction on Ferguson Road.

Site development

Hospital, housing and airport.

Moosonee Hospital Early Works

2024 to 2025
OwnerWeeneebayko Area Health Authority
General contractorPomerleau
RoleEarthworks and site preparation subcontractor
LocationMoosonee, ON

Clearing, grubbing, bulk excavation, backfill and drainage improvements for the new hospital site (2024), followed by site preparation for the pile and mud-slab program (2025). No local sub-trades required.

WAHA Early Works Staff Housing

2023 to 2025
OwnerWeeneebayko Area Health Authority
General contractorBird Construction
RoleCivil subcontractor
LocationMoosonee, ON

Road building, street light installation, culverts and drainage, underground sanitary and water services, and bulk excavation, backfill and compaction under the 2024 long-form subcontract. Sidewalks and pads completed 2025.

Nav Canada Radar Site, Moosonee Airport

2026
ClientWestower Communications for Nav Canada
RoleSite access, pad and civil works
LocationMoosonee Airport (YMO)

Site access, granular pad and civil works for the radar tower and equipment shelter.

Winter road

Wetum Road.

Wetum Road Construction, Maintenance and Decommissioning

Annual
OwnerMoose Cree First Nation
RolePrime contractor
Award2025/26 season, signed 30 November 2025
PreviousJames Bay Winter Road contract, 2022

The winter road linking Moose Factory and Moosonee to the provincial highway network. Innlink constructs the road at freeze-up, maintains and grades it through the season, coordinates closures with MCFN and decommissions it in spring.

On the Wetum Road

Keeping it open.

Keeping it open.
Marine

Moose River.

Moose River Dredging

2022
LocationMoosonee waterfront
RoleHauling and disposal-site management

Hauling of excavated material from the dredge barges and management of the disposal site during the spring ice period.

Transportation

Passenger transport.

James Bay Lowlands Secondary School Board Student Transportation

2016 to present
OwnerJames Bay Lowlands Secondary School Board
RoleTransportation contractor
LocationMoosonee and Moose Factory, ON
SeasonsOpen water, ice road, and freeze-up and break-up

Daily transport for students between Moosonee and Moose Factory, every school day of the year, by whatever the river allows.

Through open water the crossing is made by boat. Once the ice road is in, it is made by road. During freeze-up and break-up, when the ice will not carry a vehicle and the water is not yet clear, the crossing goes by helicopter and Innlink runs the vehicles that meet it on each bank. Co-op placements and graduation runs are carried alongside the daily service.

Innlink has invoiced this work since October 2016 and holds the current multi-year contract.