Project record.
Selected projects with photographs from Innlink sites. Contract values are available to owners and engineers on request.
Watermain, sanitary and roads.
Wabun Road and Fifth Street Sanitary and Watermain Rehabilitation
Rehabilitation of the sanitary sewer and watermain on Wabun Road and Fifth Street. Excavation, backfill, ditching and drainage; catch basins and manholes salvaged and reinstated. 42-line certified bill of quantities. In progress, 2026.
Bay Road and Second Street Sewer, Water and Road Rehabilitation
Sanitary, watermain and full road rehabilitation: road building, ditching, granular base and surface. Local sub-trade: Katapatuk Contracting. Completed 2025.
Ferguson Road Watermain and Road Building
Watermain installation and road construction on Ferguson Road.
Government Building Sidewalks and Pads
Formed and poured concrete sidewalks with tactile warning plates, entrance pads and broom finish.
Concrete sidewalk with tactile plate, Moosonee — 2022
Concrete sidewalk, government building, Moosonee — 2022
Broom-finish concrete pad — 2022
Concrete pad and walkway — 2022
Walkway to the entrance, Service Ontario — Moosonee
Tactile warning plate at the street edge — Service Ontario
Entrance pad and landing — Service OntarioHospital, housing and airport.
Moosonee Hospital Early Works
Clearing, grubbing, bulk excavation, backfill and drainage improvements for the new hospital site (2024), followed by site preparation for the pile and mud-slab program (2025). No local sub-trades required.
WAHA Early Works Staff Housing
Road building, street light installation, culverts and drainage, underground sanitary and water services, and bulk excavation, backfill and compaction under the 2024 long-form subcontract. Sidewalks and pads completed 2025.
Sanitary and water service installation, WAHA staff housing — 2023
Bulk excavation, WAHA staff housing — 2023
Service trench, WAHA staff housing — 2023
Underground services, Moosonee — 2023
Site excavation, Moosonee — 2023
Staff housing sidewalks and pads, Moosonee — 2025
Staff housing site finishing — 2025Nav Canada Radar Site, Moosonee Airport
Site access, granular pad and civil works for the radar tower and equipment shelter.
Wetum Road.
Wetum Road Construction, Maintenance and Decommissioning
The winter road linking Moose Factory and Moosonee to the provincial highway network. Innlink constructs the road at freeze-up, maintains and grades it through the season, coordinates closures with MCFN and decommissions it in spring.
Keeping it open.
Moose River.
Moose River Dredging
Hauling of excavated material from the dredge barges and management of the disposal site during the spring ice period.
Passenger transport.
James Bay Lowlands Secondary School Board Student Transportation
Daily transport for students between Moosonee and Moose Factory, every school day of the year, by whatever the river allows.
Through open water the crossing is made by boat. Once the ice road is in, it is made by road. During freeze-up and break-up, when the ice will not carry a vehicle and the water is not yet clear, the crossing goes by helicopter and Innlink runs the vehicles that meet it on each bank. Co-op placements and graduation runs are carried alongside the daily service.
Innlink has invoiced this work since October 2016 and holds the current multi-year contract.